Project

Bolivar & Glenelg Waste Water Treatment Plant Upgrades

SA Water

Upgrade of electric equipmnent, HA Remediation, Upgrade Implementation and ventilation.

GPA provided hazardous area upgrades at two major SA Water wastewater treatment plant sites, being Glenelg WWTP and Bolivar WWTP.
The scope of the projects was to ensure that the sites were fully hazardous area compliant to the applicable standards. GPA provided a full turnkey upgrade, detailed design, procurement of materials and contracted and managed multiple installation contractors to perform the upgrade
works.
GPA additionally designed and installed ventilation systems to meet required air change-out rates for the purpose of achieving hazardous area compliance. This has included the sizing, selection and layout of fans, structural design of exhaust stacks and concrete penetrations and sound attenuation.
GPA has also been involved in piping design throughout these facilities.
This has included material selection, piping stress analysis, code compliance, the design of double block and bleed systems and the specification
of various valves and instrumentation.