Pine Gap Pipeline and Meter Station

Apa Group

GPA was engaged to design and manage construction of a 6km, high-pressure gas, lateral pipeline, across difficult terrain, from the Palm Valley - Alice Springs Pipeline to the Joint Defence Facility, Pine Gap.

The scope also included a Pressure Reduction and Metering Station (PRMS) and an End of Line (EOL) Facility. The PRMS included a water bath heater, dual run active and monitor regulators, Control Hut, SCADA. GPA undertook design, survey, environmental consulting, procurement, construction management and risk engineering services.