SunHQ Hydrogen Hub
GPA was engaged by Sun Metals and Ark Energy to provide multidisciplinary engineering design services for the Balance of plant and integration of vendor packaged equipment. GPA has supported Ark from FEED, through detailed design, producing issued for construction deliverable , programming, providing construction support, as well as Owners Engineering services. The facility is being commissioned with GPA providing both site and remote support.
The project involves a 1MW PEM electrolyser producing green hydrogen from Sun Metal’s 121MWAC solar farm. On-site compression, storage, and refuelling facilities are intended to sustain a fleet of five 140 tonne rated hydrogen fuel cell electric trucks. These trucks, the largest of their kind in the world, will operate between the Sun Metals Zinc Refinery and the Port of Townsville which is an approximately 30km round trip. The use of the hydrogen will displace five existing diesel prime movers and avoid ~1300 tonnes of CO2 emissions every year.
The facility will also have additional capacity to provide third-party customers with green hydrogen to further decarbonize local industry.